14 March 2014
Continuing the work on the bellow-based instrument at the internal workshop within the UdK as part of the 3DMIN project. Today:Bellow-building.
Read as well part 1, part 2, part 3, part 4, and part 5 of the 3DMIN workshop documentation.
LFTri
lfsaw@lfsaw.de
LFSaw
tai-studio